
SAR Ramadan Iftar 2026
The SAR team came together for a Ramadan iftar, sharing time beyond the workplace and strengthening the connections behind our everyday work.
Explore SAR’s technical training, industry activities and team moments.
No activities found for this period.

The SAR team came together for a Ramadan iftar, sharing time beyond the workplace and strengthening the connections behind our everyday work.

SAR carried out on-site HVAC diagnosis and troubleshooting at Petronas ASEAN Bintulu Fertilizer, examining air-conditioning equipment and system operation in an industrial setting.

SAR and ARVO joined a technical training activity at ADTEC (ILP) Shah Alam, combining discussion with practical demonstrations of HVAC tools and equipment.

An activity at Kolej Vokasional Sungai Buloh brought participants together around air-conditioning equipment for practical learning and technical exchange.

The Topaire product training session provided an opportunity to explore air-conditioning products through presentations, discussion and shared technical learning.

A Panasonic product training visit combined classroom presentations with a closer look at air-conditioning systems and their components.
Page 1 of 2
Juhari brings experience in HVAC installation, project engineering, mechanical and electrical supervision, and facilities maintenance. His background connects technical planning with the practical requirements of work on site.
Sani brings experience in air-conditioning service, technical support, and warranty operations. His background supports the investigation of equipment issues and the ongoing service needs of installed systems.
Danny brings a mechanical engineering background with experience in mechanical design and management, contributing a practical understanding of equipment and project requirements.